The Engineer must act within specific time limits (usually 42 days). Failure to do so can lead to a "deemed rejection," triggering the dispute process. 3. Strict "Hard" Time Bars for Claims
Both the Employer and the Contractor are now subject to the same 28-day notice period for claims. fidic 2017 a practical legal guide pdf updated
The 2017 forms place a heavy legal burden on the Contractor regarding scheduling. The Engineer must act within specific time limits