Assemble the X-ray and DR I/O terminal blocks.
Assemble the X-ray tube head and attach the collimator. Cable Connections: Connect the Up/Down switch and sensors.
Always use personal monitoring and protective devices. drgem x ray service manual install
Connect the emergency switch and assemble the tube cover. 3. Electrical and System Integration
Secure the HV cable, rotor cable, and earth cable. Ensure all connectors are properly seated to prevent equipment damage. Assemble the X-ray and DR I/O terminal blocks
Enter service mode on the control console to run the SDK software and diagnostics.
Establish the connection between the PC Interface Module and the generator. drgem x ray service manual install
Connect the display console to the generator main cabinet.